ブックマーク / www.tepco.co.jp (1)

  • TEPCO : News | Photos For Press

    Download Discharge canal sampling building of Unit 1-4 at Fukushima Daiichi Nuclear Power Station located around the ocean-side discharge canal (When fire was detected) (pictured on April 12, 2011) Discharge canal sampling building of Unit 1-4 at Fukushima Daiichi Nuclear Power Station located around the ocean-side discharge canal (After initial extinction) (pictured on April 12, 2011) Intake cana

    boudicca
    boudicca 2011/04/18
    T-hawk撮影video・写真(4/15福島第1原発1,3,4号炉)~津波福島第一原発直撃(3/11video)等
  • 1